Facilities Master Plan - Phase 1
Phase 1 of our Facilities Master Plan includes a districtwide set of improvements focused on secure entrances, access control, communication systems, site and pavement repairs, roofing, HVAC, accessibility, and other priority building needs.
A broad investment in safety, building systems, accessibility, and learning environments expected to save the District approximately $220,000 annually through lower utility costs and reduced maintenance, repairs and equipment needs:
- Security - Secure entries and districtwide access-control modernization
- Sites & Exteriors - Roofing, parking lots, playgrounds, sidewalks, lighting, and drainage
- Student Spaces - Cafeteria seating, playground equipment, offices, clinic spaces, and building updates
- Building Systems - HVAC, electrical infrastructure, communication systems, and fire protection
- Accessibility - Accessible routes, parking, curb ramps, elevators, and circulation improvements
- Facility Stewarship - Projects that protect public assets and support safe, reliable, functional buildings
The school-by-school summaries that follow provide an overview of the work planned or underway at each facility. The improvements are intended to strengthen safety, reliability, accessibility, comfort, and the long-term care of community facilities.
Questions, comments or feedback can be directed to:
Cassandra Schug, PhD
Superintendent of Schools
cschug@district100.com
Phase 1: Caledonia Elementary

Electrical Systems
- Access control modernization: Replace existing card readers with keyless entry systems. This strengthens control of building access and creates a consistent security platform.
- Schoolwide communication system: Install a new public address, clock, and bell system to support reliable everyday announcements and emergency communication. The main thrust of this system is a microphone/speaker system that enables all students to clearly hear the teacher, no matter where the student or teacher is in the room.
Educational Adequacy
- Secure entry remodel: Relocate the main office and nurse to the front of the building and move the art room into the existing office area. This creates a clearer, more secure visitor entry sequence.
- Cafeteria seating: Provide updated cafeteria seating to better support student dining and daily use of the space.
Phase 1: Lincoln Elementary

Electrical Systems
- Access control modernization: Replace existing card readers with keyless entry systems, improving building access management and system consistency.
Exterior Finishes
- Hard-surface playground: Reconstruct the paved playground and renew pavement markings to improve the condition and usability of the outdoor play area.
- Sidewalk and curb repairs: Replace identified sidewalk areas to address trip hazards and repair damaged curb at Bonus Avenue and Conlin Court.
Educational Adequacy
- Secure entry remodel: Build a secure vestibule in the lobby while keeping the main office and kindergarten in their current locations.
- Cafeteria seating: Provide updated cafeteria seating to support student dining.
Phase 1: Meehan Elementary

Electrical Systems
- Access control modernization: Replace existing card readers with keyless entry systems, improving building access management and system consistency.
Exterior Finishes
-
Sidewalk and accessibility upgrades: Replace identified sidewalks to address trip hazards and reconstruct accessible curb ramps at the main entrance.
-
Playground improvements: Reconfigure the playground with a soft-surface addition and new equipment to improve safety and play opportunities.
Educational Adequacy
-
Secure entry remodel: Build a new secure vestibule in the lobby to create a more controlled visitor entrance.
-
Cafeteria seating: Provide updated cafeteria seating to support student dining.
Phase 1: Seth Whitman Elementary

Electrical Systems
- Schoolwide communication system: Install a new public address, clock, and bell system to support reliable everyday announcements and emergency communication. The main thrust of this system is a microphone/speaker system that enables all students to clearly hear the teacher, no matter where the student or teacher is in the room.
- Secure entrance controls: Add card access and door controls at the secure entrance to improve visitor and building access management.
- Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Systems
- Maintenance garage utilities: Add water service and a hose connection to support maintenance operations by providing the ability to properly clean and maintain grounds equipment (commercial lawnmowers, snow plows, and vehicles) which will increase equipment lifespan and lower repair costs.
Phase 1: Washington Academy

Mechanical Systems
- HVAC modernization: Replace heat-pump and variable refrigerant flow systems with a central HVAC system to improve reliability, comfort, energy use, and long-term maintainability.
- Office HVAC work: Complete heating and cooling improvements serving the office area.
Electrical Systems
- Schoolwide communication system: Install a new public address, clock, and bell system to support reliable everyday announcements and emergency communication. The main thrust of this system is a microphone/speaker system that enables all students to clearly hear the teacher, no matter where the student or teacher is in the room.
- Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Finishes
- Metal roof restoration: Restore metal roof sections throughout the building to protect the facility and extend roof service life.
Educational Adequacy
- Secure entry and main office: Remodel the main office and create a secure entrance sequence from the existing vestibule.
Phase 1: Central Middle School

Electrical Systems
-
Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Systems
-
Accessible route and parking: Provide an accessible route to the main entrance and improve accessible parking, curb, and ramp connections in the south lot.
Educational Advocacy
-
Secure entry sequence: Expand the vestibule and reconfigure the main office circulation desk so visitors enter directly into the office.
Phase 1: South Middle School

Mechanical Systems
-
Central HVAC replacement: Replace heat-pump and unit-ventilator systems with a central HVAC system to improve reliability, comfort, energy use and long-term maintainability.
-
Fire protection separation: Separate the sprinkler system from HVAC piping so the life-safety system operates independently of the heating and cooling system.
Electrical Systems
-
Access control modernization: Replace existing card readers with keyless entry systems.
Educational Adequacy
-
Secure entry sequence: Expand the vestibule and reconfigure the main office circulation desk for direct visitor access to the office.
Phase 1: Belvidere High School

Mechanical Systems
-
Kitchen cold storage: Replace the walk-in cooler and freezer, increase cooler capacity and energy savings, and relocate dry storage to better support food service operations.
Electrical Systems
- Electrical infrastructure: Replace aging electrical service panels and install a new branch transfer switch to improve reliability and distribution of power.
- Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Systems
- Roof restoration: Restore identified roof sections to protect the building and extend roof service life.
- Parking and site improvements: Reconstruct key parking areas, improve markings and accessibility, replace south lot lighting, and repair identified sidewalks.
- Maintenance garage utilities: Add water service and a hose connection to support maintenance operations by providing the ability to properly clean and maintain grounds equipment (commercial lawnmowers, snow plows, and vehicles) which will increase equipmentlifespan and lower repair costs.
Educational Adequacy
- Secure entry remodel: Build a secure vestibule in the lobby to create a controlled visitor entrance
Phase 1: Belvidere North High School

Mechanical Systems
- Varsity locker room cooling: Add cooling to the varsity locker room to improve occupant comfort.
- Sanitary piping replacement: Replace identified urinal drain piping within the wall to address plumbing infrastructure.
Electrical Systems
- Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Systems
- Parking lot maintenance: Patch and seal the south parking lot and west bus parking lot to extend pavement life.
- Sidewalk repairs: Replace damaged concrete between the parking lot and building and address identified sidewalk trip hazards.
Educational Adequacy
- Secure entry sequence: Expand the vestibule to provide visitors with direct access to the main office.
Phase 1: Everest High School

Electrical Systems
- Exterior lighting: Replace soffit box lights to improve exterior illumination and fixture reliability.
- Access control modernization: Replace existing card readers with keyless entry systems.
Exterior Systems
- Site drainage: Modify drainage on the east side of the building to improve water management around the site.
Educational Advocacy
- Secure entry remodel: Create a secure entry and add a canopy to improve visitor access and weather protection.
- Office remodel: Remodel the existing clinic area for office use.
- Clinic update: Purchase and remodel a building for clinic use to better support student services.
Phase 1: Central Office - District Administration Building

Mechanical Systems
-
HVAC modernization: Replace heat-pump and variable refrigerant flow systems with a central HVAC system to improve reliability, comfort, energy use, and long-term maintainability.
Phase 1: Operations Building

Electrical Systems
-
Access control modernization: Replace existing card readers with keyless entry systems, improving building access management and consistency.
Phase 1: Wellness Center

Interior Renovation & Clinic Conversion
-
Added new, right-sized exam rooms, a lab, and medical storage areas.
-
Created appropriate spaces for medical staff and patient services, including offices, a conference room, and a reception area.
Exterior & Site
-
Exterior improvements: New roof, doors, windows, sidewalk approach, landscaping, and a resurfaced parking lot.
-
Site Improvements: The building was also transitioned from well water service to city water as part of the project.
HVAC Systems & Technology
-
Heating and cooling systems: Updated at this time, along with the electrical and technology infrastructure needed to support modern medical practices.
